How to use a note before an inquiry
Start with the shirt or the roll, not with an adjective in a title. A garment program needs fabric construction, graphic size, and the heat step. A roll program needs width and the take-up. Mark each of those mandatory, preferred, or unknown. The note will not choose them.
Separate the printer from ink, transfer paper, the RIP seat, and the press or calendar. If a seller says the package is complete, the note still expects a line for each of those items. A missing line is an open question. It is not a zero and it is not proof the item is included.
Electrical input belongs in volts, hertz, and phase. Print area belongs in millimeters or inches, and it is not the crate size. Throughput belongs with the resolution, the media, and the color count. A factory acceptance test, if you intend to buy one, should name the file you care about.
Documents to request are a current datasheet, a drawing tied to the proposed model, and any certificate whose model list you can read. Those papers describe the supplier offer. They do not become credentials of Sublimation Printer For Shirts Sourcing.
When the note and your file agree, send the brief from the request page. If you are still choosing a label, start at the inquiry configurations. Room limits are on the application page, and process trade-offs are on Technology Selection.
An optional budget can travel with the note. State the currency and whether the figure is per printer or for the whole order. Supplier preference, if you have one, is a presentation instruction. It is not a rank this desk has audited, and you can leave it undecided.